Audi Q3 Owners & Service Manuals

Audi Q3: Connections for Quick-Release Coupling on Refrigerant Circuit

General Information

  • Only valves and connections that are resistant to refrigerant R134a and refrigerant oil must be installed.
  • Different connections (outer diameter) for high pressure and low pressure side.
  • Discharge the refrigerant circuit before removing valves or valve inserts.
  • Always screw on sealing caps.

Allocation in the vehicle. Refer to → Heating, Ventilation and Air Conditioning; Rep. Gr.87; System Overview - Refrigerant Circuit (vehicle-specific repair manual).

  WARNING

There is a danger of ice-up.

Refrigerant will leak out if refrigerant circuit is not discharged.

Refrigerant must be extracted before opening refrigerant circuit. If refrigerant circuit is not opened within 10 minutes of extraction, pressure may form in refrigerant circuit due to evaporation. Extract the refrigerant once more.

Connections with Schrader Valve (Needle Valve)

  • -A- Service connection (soldered in)
  • -B- valve insert (Schrader valve or needle valve)
  • -C- O-ring (belonging to the valve)
  • -D- cap with seal

  Note

  • After connecting, install the hand wheel for the service coupling just far enough into the quick-release coupling adapter until the valve is securely opened inside the service connection (pay attention to the pressure gauge, do not put too much pressure on the valve).
  • For removing and installing the valve set -B- when the refrigerant circuit is evacuated, for example, use an adapter from the Refrigerant Sockets -T10364-.
  • Tighten the valve insert -B- very carefully because the tightening specification is very small.
  • There are different versions of these valves and therefore there are different tightening specifications. Valve insert -B- with a VG5 (5.2 x 0.7 mm, tire valve) thread has a tightening specification of 0.4 Nm +- 0.1 Nm; a valve insert with a M6 x 0.75 mm thread has a tightening specification of 0.9 Nm +- 0.1 Nm, and a valve insert with a M8 x 1.0 mm thread has a tightening specification of 2.0 Nm +- 0.2 Nm.
  • There are different versions of these valves, valve inserts and their respective sealing caps. Be sure to use the correct valve version and the correct sealing cap allocation. Refer to the Parts Catalog.

Audi Q3. V87-1405

Connections with Primary Sealing Valve (Ball Valve)

  WARNING

Before unscrewing the connection, connect the service station and extract the refrigerant. Refrigerant circuit must be empty to avoid possible injury.

Connection with High-Pressure Valve

1 - Socket with internal thread (soldered in)

2 - O-ring (version and identification: black or colored. Refer to the Parts Catalog)

3 - Valve with an external thread and groove for the O-ring (identification: ball valve)

4 - Cap seal

5 - Sealing cap

Audi Q3. V87-1435

The service connection on the high pressure side depends on the vehicle, not all operating conditions of the A/C system are on high pressure (for example on the Audi Q7 e-tron). For this reason to check the A/C function in these vehicles the sensor installed in the refrigerant circuit must be used. Refer to → Heating, Ventilation and Air Conditioning; Rep. Gr.87; Refrigerant Circuit and use the Vehicle Diagnostic Tester in the "Guided Fault Finding" function.

  Note

  • After connecting, install the hand wheel for the service coupling just far enough into the quick-release coupling adapter until the valve is securely opened inside the service connection (pay attention to the pressure gauge, do not put too much pressure on the valve).
  • For removing and installing the valve -3- when the refrigerant circuit is evacuated, for example, use an adapter from the Refrigerant Sockets -T10364-.
  • There are different versions of these valves (with internal or external threads). Therefore the tightening specifications can also differ. The valves -3- with an M12 x 1.5 mm external thread have a tightening specification of 9 Nm +-1 Nm.
  • There are different versions of these valves and their respective caps. Be sure to use the correct valve version and the correct sealing cap allocation. Refer to the Parts Catalog.

    READ NEXT:

     Switches and Sensors on Refrigerant Circuit and Connections

    A/C Refrigerant High Pressure Switch -F23-   Note Switch pressures, removing and installing switches as well as switch arrangement and version. Refer to vehicle specific refrigerant circu

     Refrigerant Circuit Pressures and Temperatures

    General Information   Caution When performing work on refrigerant circuit, observe all generally applicable safety precautions and pressure container regulations. The pressures and temp

     Laws and Regulations

    General Information   Note The laws and regulations listed below are applicable in Germany. Different or additional laws and regulations may apply in other countries. The effects of clim

    SEE MORE:

     Overview - Front Brakes

    Overview - Front Brakes, 1LJ 1ZD Brakes 1 - Bolt 12 Nm 2 - Brake Rotor Allocation, refer to the Parts Catalog. Dimensions, refer to → Chapter "Brakes Technical Data" Wear limit. Must always be replaced together on both sides of the axle Do not

     Light Alloy Wheels, Care and Maintenance

    To maintain the decorative appearance of light alloy wheels for a long time, regular care is necessary. In particular, road salt and dust from brake abrasion must be thoroughly washed off every two weeks. Otherwise, the paint of the light alloy wheel will be attacked. The following are appro

    © 2019-2024 Copyright www.auq3.net